BURBAGE'S NEW HOME
59 BLACKSTONE AVE
help us build our bigger and better home!
Exciting progress is happening at 59 Blackstone!
Phase 2 is well underway at our new theatre seated right on the beautiful Blackstone River!
​
Here is a list of all that has been completed thanks to our hardworking team!
​
-
Full stage flooring expanding from wall to wall has been installed
-
A permanent lighting grid has been installed
-
Demising walls have been put up in between spaces distinguishing the back bay from the performance space
-
A sub-panel has been installed for increased electrical usage
-
The entire ceiling, along with crossbeams and sprinkler pipes, has been painted black
-
Brand-new electrical wiring has been installed in our back bay
phAsE 2

Grid and floor installed

Clerestory

Ceiling Completed

Grid and floor installed